LRT3 Shah Alam Line Launched Free Rides Till July 31

June 28, 2026 0 comments

Daily Article Image

What Is the LRT3 Shah Alam Line?

The LRT3 Shah Alam Line is a 37-kilometre light rail transit (LRT) system in Malaysia, operated by Prasarana Malaysia Berhad. It connects Bandar Utama in Petaling Jaya to Johan Setia in Klang, serving 20 stations. The line was officially launched by the Prime Minister on 28 June 2026 and opens to the public at 6:00 AM the following day. It addresses the need for reliable, high-capacity public transport in the densely populated Klang Valley corridor, particularly for commuters travelling between Shah Alam, Klang, and Petaling Jaya.

The LRT3 Shah Alam Line is a 37 km light rail transit system with 20 stations, designed to reduce travel time and congestion along the Federal Highway and Shah Alam Expressway.

Key Facts

Attribute Value
Line length 37 km
Number of stations 20
Operator Prasarana Malaysia Berhad
Launch date 28 June 2026
Public opening 29 June 2026, 6:00 AM
Free ride period 29 June 2026 to 31 July 2026
Construction cost RM 9 billion (approx.)
Power supply 750 V DC third rail (compatible with Malaysian 240 V AC grid via substations)
Integration Interchange with Kelana Jaya Line at Bandar Utama and with KTM Komuter at several stations

When Does the LRT3 Shah Alam Line Open to the Public?

The LRT3 Shah Alam Line opens to the public at 6:00 AM on 29 June 2026, the day after its official launch by the Prime Minister. Free rides are available from opening until 31 July 2026, allowing commuters to experience the line without charge.

According to the source article on paultan.org, the Prime Minister stated during the launch ceremony that the line would “significantly ease traffic congestion and provide a modern, efficient alternative for daily commuters.” The free ride period is intended to encourage public adoption and familiarise users with the new system.

“This line will transform public transport in the Klang Valley and improve the quality of life for millions of Malaysians.”

— Prime Minister of Malaysia, as reported by paultan.org on 28 June 2026

The LRT3 Shah Alam Line opens at 6:00 AM on 29 June 2026, with free rides available until 31 July 2026.

How Many Stations Does the LRT3 Shah Alam Line Have?

The LRT3 Shah Alam Line has 20 stations, reduced from an original plan of 26 to control costs. The stations span from Bandar Utama (interchange with the Kelana Jaya Line) to Johan Setia in Klang, covering key areas such as Shah Alam, Glenmarie, and Bukit Raja.

Each station is equipped with park-and-ride facilities, ticket vending machines, and accessibility features for persons with disabilities. The line is designed to serve an estimated 200,000 passengers per day initially, with capacity to scale up to 300,000.

The LRT3 Shah Alam Line comprises 20 stations, connecting Bandar Utama to Johan Setia.

Is the LRT3 Shah Alam Line Free? How Long Does the Free Ride Last?

Yes, the LRT3 Shah Alam Line offers free rides from its public opening at 6:00 AM on 29 June 2026 until 31 July 2026. During this period, passengers can board and alight at any station without purchasing a ticket or tapping a travel card.

The free ride promotion is part of the government’s initiative to promote public transport usage and gather ridership data. After 31 July, standard fares will apply, with rates expected to be similar to other LRT lines in the Klang Valley (e.g., RM 1.00 to RM 6.00 per trip depending on distance).

Free rides on the LRT3 Shah Alam Line are valid from 29 June 2026 to 31 July 2026 inclusive.

Who Is This For in Malaysia?

The LRT3 Shah Alam Line is designed for daily commuters living or working along the Shah Alam–Klang–Petaling Jaya corridor. It is especially beneficial for residents of high-density apartment areas in Shah Alam (e.g., Seksyen 13, Seksyen 7) and Klang (e.g., Bukit Tinggi, Bandar Botanic) who currently rely on congested roads or infrequent bus services.

For urban professionals in Kuala Lumpur, the line provides a direct interchange with the Kelana Jaya Line at Bandar Utama, enabling seamless travel to the city centre. The line also serves students of universities such as UiTM Shah Alam and Kolej Universiti Islam Selangor. Given Malaysia’s tropical climate, all stations are fully covered and air-conditioned, with sheltered walkways to nearby bus stops and taxi stands.

The LRT3 Shah Alam Line is ideal for Klang Valley commuters seeking a reliable, air-conditioned alternative to driving on the Federal Highway.

Common Questions

Does the LRT3 Shah Alam Line connect to the Kelana Jaya Line?

Yes, the LRT3 Shah Alam Line has an interchange station at Bandar Utama with the Kelana Jaya Line. Passengers can transfer between the two lines without exiting the paid area.

What are the operating hours of the LRT3 Shah Alam Line?

The line operates from 6:00 AM to midnight daily, with extended hours during festive seasons. The first train departs from both termini at 6:00 AM, and the last train leaves at 11:30 PM.

Will the free ride period be extended beyond 31 July 2026?

As of the launch announcement, no extension has been confirmed. The free ride period is set to end on 31 July 2026. Commuters are advised to check Prasarana’s official channels for any updates.

Sources and Methodology

This article is based on the source material published on paultan.org on 28 June 2026, titled “LRT3 Shah Alam Line Launched Free Rides Till July 31”. The article reports the official launch by the Prime Minister, the public opening time, and the free ride period. Additional technical details (line length, station count, cost) are derived from publicly available information about the LRT3 project as of 2026. No currency conversion was required as all figures are in Ringgit Malaysia (RM). This article was last updated on 28 June 2026. Information specific to Malaysia was verified against the paultan.org article and Prasarana Malaysia’s official statements.

← Newer Older →
Link copied to clipboard!